Mirayani Pradnyadari, N. L. M. A., Purnama Sari, N. N. D. and Ngurah Sunatha, I. G. (2026) “PERCEPATAN WAKTU PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE FAST TRACK ”, Jurnal Ilmiah Teknik Universitas Mahasaraswati Denpasar (JITUMAS), 6(1), pp. 71–77. doi: 10.36733/jitumas.v6i1.14044.