[1]
T. I. Praganingrum, N. L. M. A. Mirayani Pradnyadari, and I. K. Krisna Dwipayana, “Analisis Pengaruh Percepatan Waktu Pelaksanaan Terhadap Biaya (Time Cost Trade Off) Berbasis Microsoft Project: (Studi Kasus: Pembangunan Gedung Lantai III SDN 2 Panjer)”, kurvateknik, vol. 12, no. 1, pp. 21–28, May 2023.