Ngurah Sunatha, I. G., Praganingrum, T. I., Mirayani Pradnyadari, N. L. M. A. and Okky Larashati, N. P. (2023) “Analisis Tracking Waktu Penyelesaian Proyek Akibat Terjadinya Contract Change Order (CCO)”, Jurnal Ilmiah Kurva Teknik, 12(2), pp. 146–152. doi: 10.36733/jikt.v12i2.7771.