PRAGANINGRUM, T. I.; MIRAYANI PRADNYADARI, N. L. M. A.; KRISNA DWIPAYANA, I. K. Analisis Pengaruh Percepatan Waktu Pelaksanaan Terhadap Biaya (Time Cost Trade Off) Berbasis Microsoft Project: (Studi Kasus: Pembangunan Gedung Lantai III SDN 2 Panjer). Jurnal Ilmiah Kurva Teknik, [S. l.], v. 12, n. 1, p. 21–28, 2023. DOI: 10.36733/jikt.v12i1.6585. Disponível em: https://e-journal.unmas.ac.id/index.php/jikt/article/view/6585. Acesso em: 10 may. 2025.