Ngurah Sunatha, I. G., Praganingrum, T. I., Mirayani Pradnyadari, N. L. M. A., & Okky Larashati, N. P. (2023). Analisis Tracking Waktu Penyelesaian Proyek Akibat Terjadinya Contract Change Order (CCO). Jurnal Ilmiah Kurva Teknik, 12(2), 146–152. https://doi.org/10.36733/jikt.v12i2.7771