[1]
Ngurah Sunatha, I.G., Praganingrum, T.I., Mirayani Pradnyadari, N.L.M.A. and Okky Larashati, N.P. 2023. Analisis Tracking Waktu Penyelesaian Proyek Akibat Terjadinya Contract Change Order (CCO). Jurnal Ilmiah Kurva Teknik. 12, 2 (Nov. 2023), 146–152. DOI:https://doi.org/10.36733/jikt.v12i2.7771.