[1]
Praganingrum, T.I., Mirayani Pradnyadari, N.L.M.A. and Krisna Dwipayana, I.K. 2023. Analisis Pengaruh Percepatan Waktu Pelaksanaan Terhadap Biaya (Time Cost Trade Off) Berbasis Microsoft Project: (Studi Kasus: Pembangunan Gedung Lantai III SDN 2 Panjer). Jurnal Ilmiah Kurva Teknik. 12, 1 (May 2023), 21–28. DOI:https://doi.org/10.36733/jikt.v12i1.6585.